Y&S ILHAM JAYA SDN. BHD. was incorporated on 19th February 2014. It is however carrying track record from Y&S ILHAM JAYA ENTERPRISE since 2009. The company is very active in providing services maintenance and materials relating to civil and mechanical works with its specially selected key staff having many years of experience in civil works construction and engineering. Our goal is to be a total service provider to all our clients. The focus is to introduce highly advanced tools andequipment in all our jobs undertaken together with our specially selected project managers, engineers, supervisors and work force to deliver our best output on the job. All our technical staff brings their considerable experience and enthusiasm in working with clients, superintendents and engineers to ensure the smooth running and successful completion of our entire undertaken project.
Project Management Team Organization Chart
Y&S ILHAM JAYA SDN BHD gives the highest priority to health, safety and environment matters where ever we operate. We are committed to reducing the risks and hazards to health, safety and environment from our activities and services. Y&S ILHAM JAYA SDN BHD will take proactive steps towards achieving this goal and preservation of the environment we work in.
Our facilities are operated and maintained to minimize risks and in accordance with legal requirements, industry standards and best practices. We will provide resources, system and training to maintain and exceed these standards.
We will instigate and maintain open communications with our employees, contractors, clients and interested parties on our health, safety and environment expectations, commitment and standards.
As part of our continue improvement efforts, we will periodically review our health, safety and environmental policy, system and procedures to ensure their continued relevance.
We will maintain effective contingency plans, emergency response plan resources to respond to any unplanned situation.
We will set Health, Safety and Environmental business and individual goals which shall be of equal importance to any project or economic goals.
We will ensure that our contractors re competent as competent as a minimum that their HSE policies, standards, system and procedures are compatible and comply with Y&S ILHAM JAYA SDN BHD HSE Policy and Management System.
As part of our continual improvement of our Health, safety and Environment Management System, HSE Audit will be conduct on a regular basis. This to ensure that:
Our previous projects that inspired us to continuous success
| Description | Client |
|---|---|
| Rapid Projectbke: Supply & laying of brickworks, blockworks, plastering & rendering works and installation of door and door frame for MCB-602 | BinaPuri |
| Housekeeping services at INSTEP campus for 2 years contract | INSTEP |
| Housekeeping services at KTSB | KTSB |
| Signage upgrade and refurbish works FTG CEFS Response | CEFS |
| INSTEP mosque upgrade and renovation works | INSTEP |
| Aerial photo and video progress works for new Jabatan Kimia Malaysia Terengganu building | Serada Realty Sdn Bhd |
| Aerial video for proposed area jetty KTCC | Norlan United |
| Fabrication for bitumen mix export project | BJW Engineering Sdn Bhd |
| Renovation and upgrading works at Masjid Al-Ehsan INSTEP campus | Petronas Technical Training Sdn Bhd |
| To supply and intall aircond at Academic C&D at INSTEP campus | Petronas Technical Training Sdn Bhd |
| Aircond renovation works at Masjid Al-Ehsan INSTEP campus | Petronas Technical Training Sdn Bhd |
| PTP Galley renovation works | Petronas Technical Training Sdn Bhd |
| Plaster ceiling work for Masjid Kelulut, Marang, Terengganu | Cita Rampai Sdn Bhd |
| Renovation works for automotive workshop at INSTEP campus | Petronas Technical Training Sdn Bhd |
| Flare upgrade system at DDP A & DDP B | Lansutra Sdn Bhd |
| Earthwork and civil RC work for warehouse construction at Gebeng, Kuantan | Syarikat Peti Kemas |
| To supply and deliver air-conditioners system in KETENGAH headquarters | KETENGAH |
| Supply manpower, materials, tools and consumables to Inti Vista Sdn Bhd for tank painting works at Kertih Terminal Sdn Bhd | Inti Vista Sdn Bhd |
| Plaster ceiling and tiling work for Masjid Kg Surau Haji Yaakub, Marang, Terengganu | Hani Nani Construction Sdn Bhd |
| EPCC P3 hammering rectification | Dominant Energy Sdn Bhd |
| Blasting and painting works for above ground piping works at Arkema Thiochemical Plant, Kerteh, Terengganu | Algotech Sdn Bhd |
| Pipe culvert construction work at Petronas Gas Berhad under Samsung Tgast Project | PBH Trading & Construction Sdn Bhd |
| Tiling, gypsum board partition and suspended ceiling work for PRR4 project under control room renovation work for CCR123, CCR4 and KCS auxiliary building at Petronas Gas Berhad | PBH Trading & Construction Sdn Bhd |
| Plaster ceiling, aluminums and tempered glass work for Paya Bunga Square at Kuala Terengganu | WRA Sdn Bhd |
| General electrical and instrument services works for Petronas Carigali | PFCE-CG Sdn Bhd |
| HV & LV electrical motor servicing for GPP3 & GPP2 water cooled heat exchanger replacement at gas processing Kerteh, Petronas Gas Berhad | DiPETRO Synergy Engineering Sdn Bhd |
| Supply of manpower, equipment, tools and consumables and transportation for offshore electrical hook-up works - Booster Compression Brownfield Project (Carigali Hess Operating Company Sdn Bhd) | Epic Mushtari Engineering Sdn Bhd |
| Improvement of water supply system in Yong Peng, Batu Pahat construction of 2.27ML elevated reservoir and ancillary works for Syarikat Air Johor Holding (SAJH) | Pembinaan Jurubina Sdn Bhd |
| Electrical and instrumentation installation works at Arkema Thiochemical Plant (Lychee Project) Kerteh, Terengganu | Rotary Mec (M) Sdn Bhd |
| Provision of manpower, materials, equipment, tools ∓ consumables for onshore fabrication & offshore installation & rectification work for Cendor Mopu | Petrofac (Malaysia-PM304) Limited |
| Construction of civil and construction works at GPP, Kertih, Terengganu (Tgast-OSC-GPPA (TOG) Modification at gas processing plant) for Petronas Gas Berhad | Misi Setia Oil & Gas Sdn Bhd |
| Proposed pumping main of treated water from existing Palong Timur Water Treatment Plant to new water tank at Kg Awat to supply Tambang, Kg Awat, Kg Lubok Kepong and Batu Anam suction tanks, mukim of Batu Anam and Buloh Kasap, district of Segamat. C1491 - Package 2: Elevated RC Tank at Kg Awat and distribution mains for Syarikat Air Johor Holding (SAJH) | Pembinaan Jurubina Sdn Bhd |
| Fabricationand installation works for replacement of underground firewater piping (FW24) for Petronas Penapisan Terengganu | Enproserve (M) Sdn Bhd |
| Design, construction, supply, delivery, installation, integration, commissioning of the programmed of works. Construction and completion of 9.0ML new RC ground reservoir at Bukit Mengkibol and laying of 900MM DIA. X 1.0KM mild steel falling main, Kluang - Package 8 for Syarikat Air Johor Holding (SAJH) | Pembinaan Jurubina Sdn Bhd |
| Erection of rotating equipment at Arkema Thiochemical Plant (Lychee Project) Kerteh, Terengganu | Foster Wheeler E&C (M) Sdn Bhd |
Get in touch. Feel free to contact us if you have any enquiry.
Chairman
Norfauziana binti Zakaria
Bachelor of Science (Hons), Housing, Building & Planning USM